Located on the eastern end of campus between Eleanor Roosevelt College and Warren College, the Canyonview Aquatic Center features two outdoor, Olympic-sized pools, each of which can be divided into eight lanes of 50 meters in length, or 19 lanes of 25 yards in
UC San Diego West Pool Quick Facts:
- Opened February 8, 2006
- The new pool is 50 meters by 25 yards
- The pool is seven feet deep throughout
- It holds 680,000 gallons of water
- There is bleacher seating for 1,000
- Includes new weight room and locker rooms
- The architects for the project were Hanna, Gabriel, Wells
- Matthew Wells was the principal architect
- The pool was designed by Aquatic Design Group
- The General Contractor was Taylor-Frager
- The Pool Construction was completed by Mission Pools
UC San Diego East Pool Quick Facts:
- Heated year-round to 80-85 degrees
- Bleacher seating for 336 and additional seating up to 1,000 total on grass
- Men's and women's locker rooms with showers
- Lights on the deck accommodate night use
- Diving area consists of one five-meter platform, two three-meter platforms, and two one-meter platforms length. The aquatic center also features a state-of-the-art weight room. Canyonview is home to the UC San Diego men's and women's water polo teams, as well as the men's and women's swimming programs.
Manager