The new community complex will include a twin-pad arena, a Peterborough Public Library branch, an indoor track, multi-purpose space, and leasable office space.
Facility:
Two ice surfaces with 500 seats on each pad
Walking/Running track (outer track: 125 metres; inner track: 117 metres)
12 team change rooms and 3 official rooms
A team training area
Two multi-purpose rooms
Peterborough Public Library branch space (opening later in 2025)
Manager